Alamo 60C Operator's Manuel de l'opérateur Page 42

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 138
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 41
ASSEMBLY
BH20 SeriesSeries 04/13 Assembly Section 3-2
© 2013 Alamo Group Inc.
ASSEMBLY
DEALER SETUP INSTRUCTIONS
Set up mower as received from factory with these instructions.
This BH20 Series is shipped partially assembled. Assembly will be easier if components are aligned and loosely
assembled before tightening hardware. Refer to bolt torque chart in Maintenance Section. All fasteners are
Grade 5 unless otherwise specified.
1. Position on hard level surface.
2. Apply light coat of oil to gearbox input shaft.
“A” FRAME ASSEMBLY
1. Swing “A” Frame up to the vertical position.
2. Remove front capscrew, bushing and locknut
from the yoke.
3. Swing the pivot arm on top of the “A” Frame up
and place the bushing from the yoke in the
slotted hole in the pivot arm. Raise the yoke up
to a point that the pivot arm slotted hole with
bushing align between the yoke and the
bushing is in line with the front holes of the
yoke. NOTE: The slant cut of the pivot arm
should be resting atop the second bushing of
the yoke.
4. Re-install the capscrew through the yoke,
bushing and pivot arm. Install the locknut but
not so tight that the pivot arm cannot flex
between the yoke.
HITCH PINS
During shipping the Hitch Pins may both be stored on one side of the lift brackets. Remove one of the hitch
pins and move to the opposite side hitch bracket. The following diagram shows proper hitch pin locations for
different hitch point set up.
Vue de la page 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 137 138

Commentaires sur ces manuels

Pas de commentaire